Relocation Of A Steel Bridge

Our experienced engineers have successfully designed temporary works structures for various projects. The relocation of this bridge required coordination with different disciplines, including our own structural engineering team, surveyors, and on-site staff. This collaboration was essential to ensure that the bridge columns aligned accurately with the new connections and footings already in place at the new location. The margin for error was very low, as the existing bridge dimensions were fixed.

Successful completion of this project included temporary propping design, demolition sequence, and connection details for anchorage at the new footings. We take pride in our meticulous attention to detail and commitment to safety, which is reflected in the quality of our work.

 

×